Recently, Yuanping City Xinxing Carbon Black Co., Ltd.'s annual carbon black project of 150,000 tons (Phase I project) successfully obtained the environmental impact assessment approval from the Shanxi Province Department of Ecology and Environment. The approval letter stated that it agreed in principle with the overall conclusions of the environmental impact report and various ecological and environmental protection measures.
It is reported that the total investment of this project is as high as 600 million yuan. Once fully put into operation, sales revenue is expected to reach 1.2 billion yuan. The project is planned to be constructed in two phases. The first phase will build two hard carbon black production lines with an annual production capacity of 50,000 tons each and be equipped with two 6MW generating units; the second phase will plan to build an annual production capacity of 50,000 tons. Soft carbon black production line.
It is worth mentioning that the project uses the exhaust gas generated during the carbon black production process as fuel to generate electricity, which can generate 96 million kilowatt-hours per year. In addition to meeting the requirements for self-use, the remaining electricity can be used for Internet access. In addition, the project also builds one 35-ton and one 65-ton carbon black waste gas treatment and conversion unit, providing 600,000 tons of high-quality steam, using waste heat to provide winter heating to the surrounding areas of the park, effectively improving the winter heating conditions around the park, and supporting construction. Advanced desulfurization, denitrification, and waste heat recovery environmental protection facilities to achieve emission standards.